Incident #
Date
Time Dispatched
Time On Scene
TACTICAL WORKSHEET
THE FIREFIGHTER MEDIC  ·  Firefighter / EMS Training
Structure Fire · Incident Command · Fireground Accountability · ICS/NIMS Aligned
Incident Commander
Safety Officer
Accountability Officer
app.thefirefightermedic.com
Incident Information
Incident Address / Location
Incident Commander
Safety Officer
Accountability Officer
PIO / Investigator
Structure Information
Occupancy Type
# of Stories
Building Size (L × W)
Roof Type / Truss
Construction Type
I — Fire Res.
II — Non-Comb.
III — Ord.
IV — H.T.
V — Wood
Condition / Special Hazards
Weather Conditions
Temp
Humidity
Wind Speed
Wind Direction
Precip / Conditions
Staging Location
STAGE LVL 1
STAGE LVL 2
Additional Considerations
Adequate EMS on scene
REHAB established
Utilities secured (Gas / Elec)
Police / law enforcement notified
Investigators requested
Mutual Aid requested
Special hazards addressed
Media / PIO briefed
⚡ Strategic Mode
CIRCLE ONE
OFFENSIVE
Interior attack
Life safety advantage present
TRANSITIONAL
Attack through opening
No interior entry yet
DEFENSIVE
Exterior only
Structure untenable / lost
Rescue / Fast Attack
Interior Offensive
Marginal / Transitional
Defensive Exterior
OFF → DEF
Engagement Evaluation
1 = LOW RISK → 5 = EXTREME
FAVORABLE / LOW RISKEXTREME RISK / HIGH DANGER
12345
Rescue / Life Hazard12345
Fire StageEarly234Late
Savable PropertyHigh234Low
FF Danger LevelLow234High
Structural StabilityStable234Fail
Fire Flow (NFF)
GPM = L × W ÷ 3 per floor
LENGTH (ft)
×
WIDTH (ft)
÷3
= GPM/FL
Total NFF (all floors combined)
Structural Stability
Check integrity at regular intervals and document each PAR. Lightweight truss failure possible at 5–10 min fire exposure.
CHECK AT:
10 MIN
15
20
25
30
Rehab Location
Rehab Supervisor
Units in Rehab
Tactical Priorities
RECEO-VS
R
Rescue
Life safety — civilian & FF
E
Exposures
Protect adjacent structures
C
Confine
Contain at origin
E
Extinguish
Water supply, attack, knockdown
O
Overhaul
Hidden fire; investigation
V
Ventilate
PV / horiz. / vert. / PPV
S
Salvage
Property conservation
🛡 Life Safety Benchmarks
PRIORITY 1
Benchmark
TIME
UNIT
1
RIT / FAST Activated
Team staged & briefed on LUNAR
PRIMARY SEARCH
2
Primary Search — Initiated
Area: _____________
3
Primary Search — Complete
□ Negative  □ Victim(s)
SECONDARY SEARCH
4
Secondary Search — Initiated
Area: _____________
5
Secondary Search — Complete
□ Negative  □ Victim(s)
ALL CLEAR
ALL CLEAR
Life hazard mitigated — all areas confirmed
7
Victim Removal / EMS Handoff
Qty: ___  Condition: _______
🔥 Incident Benchmarks
PRIORITY 2–3
Benchmark
COMP
PAR
1
360° Size-Up Complete
Transmitted on radio
2
Command Post Established
Location announced
3
Water Supply Secured
□ Hydrant □ Tender □ Relay
4
Ventilation Ordered/Complete
□ PV □ Horiz □ Vert □ PPV
5
Utilities Secured
□ Gas □ Electric □ Other
FIRE CONTROL
Fire Under Control
Progression stopped — no further extension
7
Loss Stopped
Active fire extinguished
OVERHAUL / TERMINATION
8
Overhaul Complete
Hidden fire eliminated
9
Air Quality Verified
CO / O₂ / combustibles checked
10
Scene Transferred / Secured
Transferred to: ___________
Benchmark PAR Intervals
BENCHMARK COMP PAR
All Clear
Fire Control
Loss Stopped
Secondary Clear
10 Minutes
20 Minutes
30 Minutes
OFF → DEF
PAR Log
Every 20 min or as needed
TIME
TRIGGER
STATUS
Radio Channels
COMMAND
TACTICAL
ATTACK
SEARCH
EMS
EMERGENCY
Staging / Rehab
□ STAGING LEVEL 1
Location
Units Staged
□ STAGING LEVEL 2
Location
Units Staged
REHAB
Units in Rehab
CAN / LCAN Sit-Rep Log
Location · Conditions · Actions · Needs
TIME
UNIT
LOCATION
CONDITIONS
ACTIONS / NEEDS
Division / Group / Sector Tracker
ICS ACCOUNTABILITY
DIV / GROUP
ASSIGNMENT
UNITS ASSIGNED
PERSONNEL #
TASK
STATUS
ACTIVE
Building Diagram
A / B / C / D SIDES
C — CHARLIE (REAR)
B · B · R · A · V · O
ROOF
FL 4
FL 3
FL 2
FL 1
BSMT
D · E · L · T · A · D
A — ALPHA (FRONT)
Search
Water on Fire
Controlled
🚨
MAYDAY — LUNAR
ACTIVATE IMMEDIATELY — CIRCLE TRIGGERED ACTIONS
L
LOCATION
U
UNIT / ID
N
NAME
A
AIR SUPPLY (% / est. time left)
% remaining / est. time left
R
RESOURCES NEEDED
IMMEDIATE ACTIONS
Switch to emergency channel
Activate PASS device
Declare MAYDAY × 3 on radio
Deploy RIT / FAST team
Transmit LUNAR report
Evacuate non-essential FF
Sound evacuation signal
Notify dispatch / add resources
Saved ✓